9/30/2011

Re- Filming: Scheduled for 30th & 3rd

Unfortunately due to a member of our group quiting from the subject, we will have to tweak the script and shooting script and ask Joe to come from another group to fill the role instead of Jess.

However, we will be able to film the parts of the film in the corridor with Ash, today (Friday).

The shots below will be filmed today.


EXT Establishing shot of building
5 Seconds
English Block
INT Panning shot of Ashley walking in character
5 Seconds
English Block
INT Point of view walking through character
5 Seconds
English Block
INT Over the shoulder shot, looking at lockers
4 seconds
English Block
INT In locker shot looking out at Ashley
4 Seconds
English Block
INT High angle shot/tracking of Ashley
4 seconds
English Block
INT Mid shot of Ashley Opening Door
5 seconds
English Block